Cabinets were installed, and are already well loved. Gaylen found some pulls she likes, and the cabinet maker will install. We are trying to get some vinyl tile installed so the cabinets can be finalized. Our fireplaces were fired off, and we can lower our power bill (we have been using space heaters to keep the sheetrock and paint drying). The stairwork has been started, and some doors are hung and some millwork installed. Lee is back and we are trying to get the downstairs furnace working off of an extension cord. Some of the electrical plugs and switches are installed. We are very anxious to get our power installed!!!




November 14, 2008 at 11:18 pm |
I love the fireplace! Can I come over?