Things are moving along, as you can see from the pics.  We went with Vinyl Tile in the Kitchen and non downstairs bath, and are pleased with the result.  Painting is mostly done, and we have our bathroom vanities and laundry room cabinets.  Outside the electrical trenching is done, and we are looking forward to power hookup, hopefully in the next few days.  After months of temporary power from the old house, the idea of flipping a switch and having light, or just plugging into the wall outlet seems almost exotic.

 

 

08-house-170708-house-170508-house-1719108-house-172108-house-173908-house-174008-house-174208-house-174308-house-174508-house-174708-house-174808-house-1751

2 Responses to “Update – Nov 21, 2008”

  1. brothermac Says:

    Wish we could be closer to rejoice with you in all God has provided. Am missing our biweekly emails but totally understand the craziness of building. Am almost finished with my first DMin class which is a blessing.

    You guys are in our prayers and thoughts often.

    Have entered the blogosphere on at least a limited basis. If you want to share…
    http://brothermac.wordpress.com/

    BB

  2. Gale Morgan Says:

    Looks like the ‘knukle-head’ painters are ‘out of control’!